Breakevent Point and Incremental Analysis in Decision Making of Lease-Purchase Option of Heavy Equipment at Nickel Lateritic Ore Mining
| Deskripsi | ARPN Journal of Engineering and Applied Sciences, Vol.12, No.13, pp. 4084-4088 |
|---|---|
| Oleh | Rini Novrianti Sutardjo Tui;Nur Fitriani;Aryanti Virtanti Anas |
| Anggota Publikasi | |
| Link Publikasi |
Berita terkini
Field Trip Mata Kuliah Petrologi Umum 2025-12-26T02:31:31.000Z
Field Trip Mata Kuliah Geologi Dasar 2025-12-26T02:17:01.000Z
Sharing Session Bersama Lilis Sulistyani, Senior Geotech Consultant dari Entech Pty Ltd, Australia 2025-12-16T05:51:35.000Z
Prof. Dr. Ir. Sufriadin, S.T., M.T. Raih Jabatan Professor/Guru Besar dalam Bidang Ilmu Rekayasa Mineral 2025-12-10T02:35:35.000Z
Kuliah Umum: Life, Work, and Challenges as a Contractor in Nickel Mining 2025-12-10T02:28:29.000Z
- more_horiz
